Waterproofing inspection in Whittlesea

The membrane is inspected while it is still a membrane and not a finished floor.

  • After membrane application and prior to tiling
  • About 1 hour on site
  • Report within 24 hours
Get a quoteLeave your details here and we will send you a price

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage6 of 7
When to bookAfter membrane application and prior to tiling
Time on siteAbout 1 hour on site
Inspected againstAS 3740 (waterproofing of domestic wet areas), AS 3958 (tiling), NCC Volume Two Part 10.2

What is included in a Whittlesea waterproofing inspection

  • Membrane coverage across the floor and up the walls
  • Wall upturn heights at the shower and against hobs
  • Hob, threshold and step-down details
  • Bond breakers at wall and floor junctions
  • Floor waste flange bedded and sealed to the membrane
  • Falls to the floor waste and shower screed
  • Penetrations for taps, wastes and shower rails sealed
  • Membrane cure, damage and coverage before tiling
  • Primer and substrate preparation where visible
  • Set-down depth against the finished floor level
  • Junctions to baths, screens and vanities
  • Laundry, powder room and ensuite treated to the same standard
Why it matters here

Waterproofing inspections on Whittlesea builds

Waterproofing failures are often the costliest defects in a new build. Dismantling the room to fix moisture issues after tiles are laid adds significant expense. What we have recorded in Whittlesea is membrane work left simply incomplete in a wet area, which is the version of this failure that is easiest to catch and cheapest to correct, provided somebody looks before the tiler starts.

What we find at this stage in Whittlesea

  • Wet area waterproofing incomplete
  • Building reports limited to the minimum height
  • Inspect the membrane coating for bandage issues
  • Missing or wrong water stop angles
  • Sealed penetrations and outlet lugs
Balustrade fixings may have compromised waterproofing, recorded during a waterproofing inspection in Lilydale
The balustrade fixings likely penetrated the waterproofing membrane and could let water in, Lilydale
Sample findings

Sample defects found during our waterproofing inspections in Whittlesea

Annotated findings from Waterproofing inspections.

Additional coat required, recorded during a waterproofing inspection in Beveridge
The waterproofing membrane was applied improperly and needs an extra coat, Beveridge
Protect waterproofing membrane, recorded during a waterproofing inspection in Beveridge
The waterproofing membrane requires protection until the finished surfaces cover it, Beveridge
Door jambs and architraves, recorded during a waterproofing inspection in Beveridge
Door jambs and architraves below the floor tiling must be waterproofed to stop water entering the home, Beveridge
Behind vanity, recorded during a waterproofing inspection in Beveridge
The inspector could not inspect the waterproofing behind the vanity because it was installed after waterproofing, Beveridge

The other stages of a Whittlesea build

  1. Bored piers inspection in Whittlesea1Bored piersAfter drilling and cage placement, before concrete
  2. Slab pre-pour inspection in Whittlesea2Slab pre-pourThe day before pouring, before waterproofing
  3. Frame inspection in Whittlesea3FrameAfter wall frame erection and bracing, before lining
  4. Lock-up (pre-plaster) inspection in Whittlesea4Lock-up (pre-plaster)After roof cladding and external doors, before plasterboard
  5. Fixing inspection in Whittlesea5FixingAfter joinery and doors installed, before painting
  6. Pre-handover (PCI) inspection in Whittlesea7Pre-handover (PCI)Two to three weeks prior to handover

All construction stage inspections in Whittlesea →

Guides

Construction stage guides for Whittlesea

All guides →

Book a waterproofing inspection in Whittlesea

Instant online pricing for Whittlesea, or contact the booking team.

FAQ

Waterproofing inspections in Whittlesea: common questions

What standard applies?

Check waterproofing in wet areas against the Domestic Building Contracts Act 1995, the Guide to Standards and Tolerances, and the approved drawings.

Is the drainage system tested?

No. Waterproofing systems are tested in place by the contractor and this work is separate to a building inspection. Inspectors look at the site with their eyes and hands. This helps find work that is missing or finished poorly.

When does the contract close?

Timing between waterproofing and tiling often happens quickly. Schedule a pre-concrete pour inspection to inspect the waterproofer work before the concrete is laid.

Where can defects appear on your new build?

You might notice wet skirting boards or discoloured walls a year after you settle in. This approach means tearing up tiles, the screed and starting the work over again.

Is this inspection separate from the fixing inspection?

It frequently is, and on most Whittlesea builds the two run as a single visit. We suggest booking a separate inspection before the tradespeople finish work.

Who is responsible for the repairs?

The final inspection usually checks the coordination between the waterproofer and the tiler. The inspection details the site address and specific contract terms. This information allows builders to fix defects before floor coverings are laid.